• Item Details
    Central Office / Capital Program Mgmt /
    Other
    21059
    01/02/2026
    No BE Goals
    Mid (LOI 8 pages max)
    To Be Determined
    No
    9.3% Plus Overhead Factor
    Yes
    1
    Four year, INDOT's option to extend one time for one year to allow for completion of services.
    Other Development of Compliant INDOT Transportation Asset Management Plan
    The Indiana Department of Transportation (INDOT) is committed to the continued development of a comprehensive asset program to improve and sustain at acceptable levels the condition of its bridge and roadway infrastructure. INDOT is soliciting proposals from qualified consultants to develop a risk-based, Transportation Asset Management Plan (TAMP). See https://www.fhwa.dot.gov/asset/plans.cfm. Interested respondents shall include a cost proposal in the Letter of Interest (LOI) for this item which will be considered in the selection evaluation process. The cost proposal shall be included in the 8 page LOI page count limit.
  • Des Work Description
  • Required Prequalification Categories (Combination of Prime and Sub Consultants) Work Type
    Yes
    No additional qualification
  • Performance type
  • Deliverables
  • Supporting Documents
* This color background fields are mandatory