    Greenfield District / Capital Program Mgmt
    Project Specific
    19884
    06/10/2025
    DBE: 7%
    High (LOI 12 pages max)
    Lump Sum
    No
    10.2% Plus Overhead Factor
    Yes
    1
    $1,700,000.00
    Project Development Services Intersection Improvement Project, Intersection Improvement, Roundabout on US-36 at CR750W, on SR-38 at SR-234, on SR-32 at Durbin Rd, on SR-32 at Prairie Baptist Rd. and Small Structures & Drains Construction at various locations.
    The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents in accordance with the INDOT project development process. The selected firm shall complete an Engineering Assessment (if necessary), Road Design and Plan Development, Environmental Documentation, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking, if needed), Geotechnical Engineering, Utility Coordination, Pavement Design, and Construction Phase Services. Other services such as Ecological Surveys, Archeological Investigations, Historical/Architectural Investigation, professional public outreach and marketing services, and Wetland Mitigation, may be included later if these work types become necessary. INDOT will provide the Real Estate Services for this project, if needed. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected firm's fee proposal shall be due 45 calendar days after the selection date for his RFP item. The contract may utilize the INDOT Einvoice application.
  • Des Work Description
  • Required Prequalification Categories (Combination of Prime and Sub Consultants) Work Type
    Yes
    No additional qualification
  • Performance type
  • Deliverables
  • Supporting Documents
* This color background fields are mandatory