• Item Details
    Seymour District / Capital Program Mgmt
    Project Specific
    19462
    04/08/2025
    DBE: 5%
    Mid (LOI 8 pages max)
    Lump Sum
    No
    8.8% Plus Overhead Factor
    Yes
    1
    $800,000.00
    Project Development Services - South Region Replacement of Small Structures and Drains along SR-67 & US-231 in Owen County, Seymour District.
    The selected firm will perform the design and plan development work necessary to produce the construction contract documents. The selected firm will be required to provide an Abbreviated Engineering Assessment Report, Environmental Documentation, all Permits, Road Design, Pavement Design, Geotechnical Investigation, Utility Coordination, Hydraulic Analysis and Design, Right of Way Plan Development (including Abstracting, R/W Engineering and R/W Staking), and Construction Phase Services. Additional services may also be required, such as, Section 106, Wetland Mitigation, Archaeological Investigations and Historical/Architectural Investigations. INDOT will provide Real Estate Acquisition Services and Topographic Services. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected consultant's fee proposal shall be due 45 calendar days after the Scoping Meeting. These contracts will utilize the INDOT eInvoice application.
  • Des Work Description
  • Required Prequalification Categories (Combination of Prime and Sub Consultants) Work Type
    Yes
    No additional qualification
  • Performance type
  • Deliverables
  • Supporting Documents
* This color background fields are mandatory