• Item Details
    Seymour District / Capital Program Mgmt
    Project Specific
    19380
    03/11/2025
    DBE: 5%
    Mid (LOI 8 pages max)
    Lump Sum
    No
    9.3% Plus Overhead Factor
    Yes
    1
    $500,000.00
    Project Development Services Bridge Replacement of CR-300N / Lowell Road over I-65, 3.05 miles N of SR-46 in Bartholomew County, Seymour District.
    The selected firm will perform the design and plan development work necessary to produce the construction contract documents. These services will include: an Abbreviated Engineering Assessment Report, Environmental Documentation, all Permits, Bridge Replacement Design, Topographic Survey, Pavement Design, Geotechnical Investigation, Utility Coordination, Right of Way Plan Development (including Abstracting, R/W Engineering and R/W Staking) and Construction Phase Services. INDOT will provide Real Estate Acquisition Services. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected consultant's fee proposal shall be due 45 calendar days after the Scoping Meeting.
  • Des Work Description
  • Required Prequalification Categories (Combination of Prime and Sub Consultants) Work Type
    Yes
    No additional qualification
  • Performance type
  • Deliverables
  • Supporting Documents
* This color background fields are mandatory