• Item Details
    Crawfordsville Dist / Capital Program Mgmt
    Project Specific
    17662
    03/12/2024
    DBE: 7%
    Mid (LOI 8 pages max)
    Lump Sum
    No
    9.2% Plus Overhead Factor
    Yes
    1
    Project Development Services Small Structures and Drains Construction, Vermillion, Parke and Warren Counties
    The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents for the listed project in accordance with INDOTs designated letting schedule. The selected firm will also be responsible for: Environmental Document (CE), Environmental Permits, Topographic Survey, Geotechnical Engineering, Roadway and MOT Design and Plan Development, Right-of-Way Project Management and Acquisition services, Right-of-Way Plan Development (Engineering and Staking), Right-of-Way Title Research, Right-of-Way Appraising and Appraisal Review, Right-of-Way Negotiation, Utility Coordination, Railroad Coordination, Pavement Design and Construction Phase Services. INDOT will provide approved hydraulics reports for each structure prior to NTP. Other services such as Ecological Surveys, Wetland Mitigation, archeological investigations, historical/architectural investigations, and Subsurface Utility Exploration (SUE) may be included later if these work types become necessary. The selected firms fee proposal shall be due 45 calendar days after the selection date for this RFP item.
  • Des Work Description
  • Required Prequalification Categories (Combination of Prime and Sub Consultants) Work Type
    Yes
    Railroad Coordination
  • Performance type
  • Deliverables
  • Supporting Documents
* This color background fields are mandatory