• Item Details
    Greenfield District / Capital Program Mgmt
    Project Specific
    16999
    11/14/2023
    DBE: 3%
    Mid (LOI 8 pages max)
    Lump Sum
    No
    9% Plus Overhead Factor
    Yes
    1
    $270,363.00
    Project Development Services Traffic Management System Project, ITS Communications Systems at various locations within the Greenfield District.
    The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents in accordance with the INDOT project development process. The selected firm shall complete an Engineering Assessment (if necessary), Topographic Survey, Roadway Design and Plan Development, Environmental Documentation, Permits Applications, Geotechnical Engineering, Utility Coordination and Construction Phase Services. Other services such as Ecological Surveys, Archeological Investigations, Historical/Architectural Investigation, pavement design, professional public outreach and marketing services, R/W Engineering including Title Research and surveying and Wetland Mitigation, may be included later if these work types become necessary. INDOT will provide the Real Estate Services for this project, if needed. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected firm's fee proposal shall be due 45 calendar days after the selection date for his RFP item. The contract may utilize the INDOT eInvoice application.
  • Des Work Description
  • Required Prequalification Categories (Combination of Prime and Sub Consultants) Work Type
    Yes
    No additional qualification
  • Performance type
  • Deliverables
  • Supporting Documents
* This color background fields are mandatory