• Item Details
    Greenfield District / Capital Program Mgmt
    Project Specific
    16099
    10/10/2023
    DBE: 3%
    Mid (LOI 8 pages max)
    Lump Sum
    No
    9.3% Plus Overhead Factor
    Yes
    1
    $220,781.00
    Project Development Services Bike/Pedestrian Facilities at various locations within the Greenfield District
    The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents in accordance with the INDOT project development process. The selected firm shall complete an Engineering Assessment (if necessary), Topographic Survey, Roadway Design and Plan Development, Hydraulic Analysis, Environmental Documentation, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking, if needed), Geotechnical Engineering, Utility Coordination, Pavement Design, Construction Phase Services and other related services as needed. Other services such as Ecological Surveys, Archeological Investigations, Historical/Architectural Investigation, professional public outreach and marketing services, and Wetland Mitigation, may be included later if these work types become necessary. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected firm's fee proposal shall be due 45 calendar days after the selection date for his RFP item. The contract may utilize the INDOT eInvoice application.
  • Des Work Description
  • Required Prequalification Categories (Combination of Prime and Sub Consultants) Work Type
    Yes
    No additional qualification
  • Performance type
  • Deliverables
  • Supporting Documents
* This color background fields are mandatory